Lot analysis to show building possibilities within its size, and CC&R’S restrictions. Setbacks on Lot:* Front setback 5.00 meters , open area that can be paved and built shades on it, most of the time used for extra parking or shaded parking spaces.* Beach side setback 6.00 meters (20′) can be fully used as a […]